Back to News

Personnel Record

Dana Wagner

Dana Wagner

Bridge Curator

LEDs, viewscreen, and practical lighting

December 1, 20221 min read
Personnel Record — LEDs, viewscreen, and practical lighting — engineering placeholder
Wagner installed deck LEDs, bulkhead lighting, and a large viewscreen. Peters' December 2022 update said the bridge was almost finished being totally restored by Wagner, with lighting and electronics upgraded throughout.

The Memory Alpha Historic Society records the following archive entry from Dana Wagner's personnel dossier (2020–2023).

Wagner installed deck LEDs, bulkhead lighting, and a large viewscreen. Peters' December 2022 update said the bridge was almost finished being totally restored by Wagner, with lighting and electronics upgraded throughout.

View full personnel record →

The Memory Alpha Historic Society records the following archive entry from Dana Wagner's personnel dossier (2020–2023).

Wagner installed deck LEDs, bulkhead lighting, and a large viewscreen. Peters' December 2022 update said the bridge was almost finished being totally restored by Wagner, with lighting and electronics upgraded throughout.

View full personnel record →